Sequence for grounding of main bus section A:
It is assumed that the tie CB is in the energized condition:
- Open all disconnect switches on “A” bus and verify by viewing.
- Block closing of disconnect switches.
- Open tie circuit breaker[Figure(a)].
- Open bus B disconnect switch of bus tie CB [Figure(b)]. Verify by viewing.
- Close the bus B grounding switch [Figure(b)] (possible only if all disconnect switches on “A” bus feeders are in open position). Verify by viewing.
- Close the tie CB.
- Lock tie CB in closed position according to manufacturer’s O&M manual.
- The A bus is grounded.
Sequence for grounding of main bus section B:
- Open all disconnect switches on “B” bus. Verify this by viewing.
- Block closing of disconnect switches.
- Open the tie circuit breaker.
- Open bus “A” disconnect switch of the bus tie circuit breaker [Figure(a)]. Verify by viewing.
- Close the bus “A” grounding switch [Figure(a)] (possible only if all disconnect switches on “B” bus feeders are in open position). Verify by viewing.
- Close the tie CB.
- Lock tie CB in closed position according to manufacturer’s O&M manual.
- The B bus is grounded.